Phone 0800 030 4391

HRS Services - ENERGY, SAP, EPC, SBEM & BREEAM
  • Yousendit File Upload for HRS Services
  • FILE UPLOADS: If you have any information about any planning conditions, client/local authority requirements, noise surveys, acoustic reports etc, if there is a BREEAM requirement, or any references to POL8 (plant etc), please click on the link above and attach any information you have.
  • HRS Acoustics department will provide you with a quote as soon as possible.

signup to our newsletter






BREEAM 2011 Pol 05 Credits

The information shown below is also available to download in spreadsheet format, and aims to help summarise the credits that your project could be targeting and is split into two tabs, one for BREEAM Health & Wellbeing Hea 05 credits and one for the BREEAM Pollution Pol 05 credits.

For Pol05 tab there is a single credit available regardless of building type and this is generally applicable to all projects.

We hope you find the spreadsheet useful, needless to say HRS Acoustics and BREEAM staff are always available to assist with any queries you may have relating to BREEAM acoustic credits – or any other acoustic issues.

NATIONWIDE SERVICE - PHONE: 0800 030 4391


POLLUTION Pol 05 CREDITS

Aim: To reduce the likelihood of noise from the new development affecting nearby noise-sensitive buildings

BREEAM 2011 Pol 05 CREDITS
  Total Credits Available 1    
Site Criteria Noise Impact Criteria Credits Testing Requirements Notes
Where there are or will be noise-sensitive areas or buildings within 800m radius of the assessed development a noise impact assessment in compliance with BS 7445:1991 has been carried out and the following noise levels measured/determined:
a.
Existing background noise levels at the nearest or most exposed noise-sensitive devel-opment to the proposed development or at a location where background conditions can be argued to be similar.
b.
The rating noise level resulting from the new noise-source (see also Compliance note: Compliance at the design stage).
The noise level from the proposed site/building, as measured in the locality of the nearest or most exposed noise-sensitive development, is a difference no greater than +5dB during the day (0700hrs to 2300hrs) and +3dB at night (2300hrs to 0700hrs) compared to the back-ground noise level. 1 The noise impact assessment must be carried out by a suitably qualified acoustic consultant holding a recognised acoustic qualification and membership of an appropriate professional body (see Relevant definitions in the Additional Information section).

The credit can be awarded by default where there are or will be no noise-sensitive areas or buildings within 800m radius of the assessed development.

Where the noise source(s) from the proposed site/building is greater than the levels described in criterion 4, measures have been installed to attenuate the noise at its source to a level where it will comply with criterion 4.

N.b. wording is reproduced from BREEAM Scheme Document for New Construction (SD5073 - 2.0: 2011) including amendments advised by BREEAM Technical Nov 2011.

Useful Links

HRS Summary - BREEAM 2011 Updates (PDF)

Breeam 2011 Updates - Frequently Asked Questions

HRS Guide to Compliance - from Concept to Completion (pdf) >

HRS Guide to BREEAM 2008 Compliance - from Concept to Construction (pdf) >

HRS Guide to BREEAM 2011 Compliance - from Concept to Construction (pdf) >

How HRS Can Help You Gain BREEAM Credits (pdf) >

Logos for various bodies

Acoustic Consultants - Case Studies

Click headings to read more

Show all scroller content

Lark Hill Retirement Village

Acoustic consultancy and testing for the largest ExtraCare development in the UK

Raithwaite Hall

Part E design advice for a 45-bed luxury country house hotel

Kingswood School

BB93 consultancy and testing for a new specialist arts college

Imperial College

Acoustic consultancy and testing for a new flagship facility for the Academic Health Science Centre

Aylesbury Vale District Council

Acoustic design advice for the Council’s new 3 storey office building and conference centre