Phone 0800 030 4391
Email >
- AIR TIGHTNESS CONSULTANCY & TESTING
- ENERGY, SAP, EPC, DEC & SBEM
- BREEAM & CODE FOR SUSTAINABLE HOMES
- ACOUSTIC CONSULTANCY & TESTING
- AIR SEALING & FIRE STOPPING
- THE COMPLETE PACKAGE
- Acoustics Homepage
- Acoustics for Education
- Acoustics for Healthcare
- Acoustics for Residential
- Acoustics for Offices
- Acoustics for Industrial & Commercial Premises
- Acoustics Design Review
- Sound Insulation Testing
- Planning and Noise
- British Standard 8233
- Approved Document E
- Improving Sound Insulation Performance
- Code for Sustainable Homes
- Domestic Dwellings
- Flagship Projects
- Brochure Request/Download
- Frequently Asked Questions
- Related Services
Code for Sustainable Homes
Phone
0800 030 4391
Supersceeding Breeam: Ecohomes 2006 (For new homes in England only), the "Code for Sustainable Homes" has a credit system which is in addition to that of Approved Document E of the Building Regulations.
Assessment Criteria
Credits are awarded for achieving higher standards of sound insulation than those given in Approved Document E of the Building Regulations and demonstrating it by either using post-completion testing (called pre-completion testing in Approved Document E and in the text) or Robust Details as follows:
Increases to the Sound insulation requirements
Credits |
Improvement of Approved Document E (dB) |
|
Airborne Sound DnT,w+Ctr |
Impact Sound L'nt,w |
|
1 |
+3 |
-3 |
3 |
+5 |
-5 |
4 |
+8 |
-8 |
| Criteria | Class |
| A commitment to carry out a programme of pre-completion testing based on the Normal programme of testing described in Approved Document E for every group or sub-group* of houses or flats, and to achieve airborne sound insulation values that are at least 3dB higher, and impact sound insulation values that area at least 3dB lower, than the performance standards set out in the Building Regulations for England and Wales, Approved Document E (2003 Edition, with amendments 2004) | 1 |
| OR | |
| A commitment to use constructions for all relevant building elements that have been assessed and approved by Robust Details Limited, and found to achieve the above performance standards | |
| A commitment to carry out a programme of pre-completion testing based on Normal programme of testing described in Approved Document E for every group or sub-group* of houses or flats, and to achieve airborne sound insulation values that are at least 5dB higher, and impact sound insulation values that are at least 5dB lower, than the performance standards set out in the Building Regulations for England and Wales, Approved Document E (2003 Edition, with amendments 2004). | 3 |
| OR | |
| A commitment to use constructions for all relevant building elements that have been assessed and approved by Robust Details Limited, and found to achieve the above performance standards. | |
| A commitment to carry out a programme of pre-completion testing based on the Normal programme of testing described in Approved Document E for every group or sub-group* of houses and flats, and to achieve airborne sound insulation values that are at least 8dB higher, and impact sound insulation values that are at least 8dB lower, than the performance standards set out in the Building Regulations for England and Wales, Approved Document E (2003 Edition, with amendments 2004) | 4 |
| OR | |
| A commitment to use constructions for all relevant building elements that have been assessed and approved by Robust Details Limited, and found to achieve the above performance standards. | |
| Default Cases | |
| 1.Detached dwellings | 4 |
| 2.Attached dwellings where separating walls or floors only occur between non habitable rooms | 3 |
Acoustics - Flagship Projects
Click headings to read more
Acoustic solutions for office buildings
Sound insulation testing of the newly built offices at St. Omar barracks, Aldershot
Acoustics for Healthcare Premises
Pre-completion testing at new oncology & haemotology unit, Castle Hill Hospital, Hull