- Air Tightness Homepage
- Air Tightness - a Definition
- Commercial Benefits to the Building
Owner & Client - Information for the Client
- Information for the Architect
- Information for the Main Contractor
- Information for the Building Services Consultants
- Information for Material, Plant &
Component Suppliers - Information for Building Control
Officers & Approved Inspectors - Design Review
- Site Advice Visits
- Contracting Work
- Air Tightness Testing
- Air Test - Domestic Dwelling
- SAP Ratings
- SBEM Ratings
- Example Air Tightness Test
- Smoke Test
- Thermographic Surveys
- Energy Usage
- Flagship Projects
- Technical Info Packs/Video Downloads
- Brochure Request/Download
- Frequently Asked Questions
- Theory of Air Tightness
- Air Tightness - Related Services
Information for the Architect
PDF DOWNLOAD of this page
Golden Rules to Ensure Part L is Met
Designing airtight buildings is the only means of ensuring long term, low air leakage performance. Build tight – ventilate right. The objective is to minimise uncontrolled air leakage whilst maintaining controlled ventilation. Ensure the air barrier is based on structural elements, wherever possible. Condensation risk will be minimised if the air barrier or seal envelope is correctly positioned, which depends on the make up of the construction element itself. Generally, it should be placed on the warm side of the insulation layer. It is also important for the insulation layer to be continuous and to bear in mind that excessive cold air moving around loose or misplaced insulation can lead to interstitial condensation.
Ensure that the air tightness test is carried out by a member of the ATTMA – Air Tightness Test Measurement Association. The CLG recognises members of ATTMA as being ‘suitably qualified & competent’ companies to carry out air tests.
FREQUENTLY ASKED QUESTIONS
What needs to be air sealed on site?
Careful consideration is needed on all structural elements. For instance, pre-cast concrete floors may look airtight, but consider air leakage along open voids through the slab into cavities in external walls. Also think about non-structural elements such as roof liner sheets or T and G boarding. A 1mm gap along each joint adds up to a considerable area for air to leak through.
Where can I access reference to standard details?
- CLG Website
- The Stationery Office – Dwellings MCRMA
- EDA
- BRE Good Building Guides
- Kingspan
When to Get Worried
Any supplier of materials or components who can not state the air leakage rate (permeability) of their product per metre squared, as tested to BS / EN standards. Beware material suppliers who states their components are air tight. NO materials are perfectly airtight, particularly after installation on site!
Using dry lining or vapour barrier as the air barrier is possible with good detailing. However, a high level of site supervision is required to ensure all junctions are air tight and that the lining is not damaged.
Perforated liner sheets are NOT suitable as an air seal line.
If you have any concerns, request that the material or component under goes an air leakage test.
NOTE: HRS Services can undertake tests on components on or off site, to the relevant British Standard.
Air Tightness - Flagship Projects
Click headings to read more
Air test result
Tightest building in UK Air test result <0.5 m³/hour/m², HRS involved throughout
Air Tightness Consultancy
IKEA employed the UK's largest fan to check the air tightness of its Glasgow store
Poor Building Envelope Performance - Case Studies
A Complete Solution For Investigating, Analysing Problems and Providing Solutions