Phone 0800 030 4391
Email >
- AIR TIGHTNESS CONSULTANCY & TESTING
- ENERGY, SAP, EPC, DEC & SBEM
- BREEAM & CODE FOR SUSTAINABLE HOMES
- ACOUSTIC CONSULTANCY & TESTING
- AIR SEALING & FIRE STOPPING
- THE COMPLETE PACKAGE
- HRS Air Tightness SUMMARY
- Air Tightness Homepage
- Air Tightness - a Definition
- Part L Regulations - October 2010
- Part L Glossary
- Commercial Benefits to the Building
Owner & Client - Information for the Client
- Information for the Architect
- Information for the Main Contractor
- Information for the Building Services Consultants
- Information for Material, Plant &
Component Suppliers - Information for Building Control
Officers & Approved Inspectors - Design Review
- Site Advice Visits
- Contracting Work
- Air Tightness Testing
- Air Test - Domestic Dwelling
- Air Tightness Consultancy
- SAP Ratings
- SBEM Ratings
- Example Air Tightness Test
- Smoke Test
- Thermographic Surveys
- Energy Usage
- Case Studies
- Technical Info Packs/Video Downloads
- Brochure Request/Download
- Frequently Asked Questions
- Theory of Air Tightness
- Air Tightness - Related Services
Part L Regulations -
Key Changes that came into force from October 1st 2010 – Closing the gap between as designed and actual building performance
HRS Services' guide to Part L: 2010 - What you need to know . . .
Available from our Downloads Page >
Poor Building Envelope Performance - Case Studies
PDF Document Downloads >
Approved Document L1A: Conservation of fuel and power (New dwellings) (2010 edition)
Part L1A - 2010 Edition
Approved Document L1B: Conservation of fuel and power (Existing dwellings) (2010 edition)
Part L1B - 2010 Edition
Approved Document L2A: Conservation of fuel and power (New buildings other than dwellings) (2010 edition)
Part L2A - 2010 Edition
Approved Document L2B: Conservation of fuel and power (Existing buildings other than dwellings) (2010 edition)
Part L2B - 2010 Edition
Head Office: Sheffield
Southern Office: Swindon
Regional Air Testing Bases Across the UK
NATIONWIDE SERVICE:
Phone: 0800 030 4391
Below are the key points of the revision to the consultation document Part L 2010, which HRS hope will be of help to you and your colleagues:
- 2010 Regulations to deliver 25% reduction – assessed on a flat approach for dwellings and aggregate approach for non-dwellings. These targets are considerably more difficult to achieve than 2006 standards.
- A mandatory requirement for CO2 emissions calculations (BER and TER as designed) to be submitted to the Local Authority prior to start on site. SBEM and SAP calculations to be carried out early in the design stage.
- Changes to the notional building assessment procedure. Provision of renewable technologies such as biomass is no longer a quick fix solution.
- Limits on design flexibility for building fabric and services have been tightened. Aiming for worst case values will not achieve overall compliance.
- Solar gain to be calculated for all spaces whether naturally ventilated or not. Greater consideration needs to be given to building orientation, solar shading and glazing specifications.
- Quality of construction to be assessed at thermal bridging junctions. Greater penalties for details that are not accredited, or independently assessed. This will have a negative impact on the overall carbon emissions calculations.
- Worst acceptable air tightness target remains at 10m3/h.m2 at 50 pascals – though considerably more onerous carbon emissions targets must be achieved, which may necessitate a more stringent value. Aim for good thermal standards and services efficiencies within the design to avoid reliance on pre-completion testing results.
- Increased sample size of dwellings to be tested – up to 50% within a dwelling type.
- Revised definition of dwelling type and sampling rates for air tightness testing – a much greater number of dwellings will need to be tested to avoid penalties within the SAP calculation.
- The acceptance of temporary sealing for all natural ventilation devices – refer to Part F.
- ATTMA TSL1 & TSL2 documents referenced for testing dwellings and non-dwellings respectively.
- BINDT registration with respect to air tightness testing remains the only route of competence referenced in the Approved Documents.
Part L Glossary (PDF)
If you would like to view more in depth information please click our Downloads link where you will find HRS's 5 page summary document 'Part L 2010 - what you need to know' and the full Part L approved document.
If you have any questions or need help, advice or a quotation, please e-mail Rebecca Oxley or call: 0800 030 4391.
HRS Guide to Compliance - from Concept to Completion (pdf) >
Air Tightness - Case Studies
Click headings to read more
Top of the class: Passivhaus school design
Article from Building Magazine published 12.08.2011
Air test result
Tightest building in UK Air test result <0.5 m³/hour/m², HRS involved throughout
Air Tightness Consultancy
IKEA employed the UK's largest fan to check the air tightness of its Glasgow store