Phone 0800 030 4391
Email >
BUILDING & ENVIRONMENTAL
- AIR TIGHTNESS CONSULTANCY & TESTING
- ENERGY, SAP, EPC, DEC & SBEM
- BREEAM & CODE FOR SUSTAINABLE HOMES
- ACOUSTIC CONSULTANCY & TESTING
- AIR SEALING & FIRE STOPPING
- THE COMPLETE PACKAGE
ROPE ACCESS, BUILDING, BRIDGE & RAIL
- RAIL & BRIDGE WORKS
- BUILDING INSPECTION & MAINTENANCE
- HIGHWAYS BRIDGE MAINTENANCE
- CONFINED SPACES & MAST WORKS
HRS Case Studies
Please click on the link required below to go to the relevant flagship projects page
Air Tightness Consultancy & Testing - Case Studies>
- Top of the class: Passivhaus school design
- Air Tightness Consultancy - Air Testing IKEA
- Air Tightness Consultancy - British Lending Library Archives
- Existing building - Draft Problems - Case Study
- Poor Building Envelope Performance - Case Studies
- Low Energy School - Building Energy Performance Case Study
- Government Office Building - Building Energy Performance Case Study
- Hospital High Dependency Unit - Building Energy Performance Case Study
- Ingress of Files to Medical Research Labs - Building Energy Performance Case Study
- Commercial Office Building - Building Energy Performance Case Study
Energy - SAP, EPC, DEC & SBEM - Case Studies>
- HRS carry out SBEM carbon emissions (BRUKL) calculations & EPC
- SBEM calculations & EPC for an office development
- EPC for a refurbished existing healthcare building
- SAP & EPC accreditation for a 195 apartment development
Acoustics Consultancy & Testing - Case Studies >
- Residential - Lark Hill Retirement Village
- Residential - Devonport ExtraCare Scheme, Plymouth
- Residential - Aston Student Village Development - Phase 2
- Residential - University of Brighton - Varley Halls
- Residential - 77-79 Fermoy Road, Paddington, London
- Hotels - Doubletree by Hilton, Cadbury House
- Hotels - Raithwaite Hall Country Retreat, Whitby
- Retail - Sainsbury's Supermarket, Ponsharden, Falmouth
- Retail - Sainsbury's Supermarket, Alphington Road, Exeter
- Education - Kingswood School
- Education - Oak Meadow Primary School
- Acoustics for Healthcare Premises
- Healthcare - Block L, Imperial College, London
- Healthcare - Cobridge Primary Care Centre
- Acoustic Solutions for Office Buildings
- Offices - British Geological Survey - James Hutton Building
- Offices - Aylesbury Vale District Council Gateway Offices
- Air Sealing contracting - for major retail chains
Air Sealing & Fire Stopping - Case Studies >
- Air Sealing Contracting - For Major Retail Chains for over 10 years
- Air sealing, Fire Stopping Contracting Work Case Study
- 250 Wm Morrisons Stores firestopped in 18 months
- Condition Survey to Flintshire Bridge, North Wales.
- Examination of Rail Structures - Bridges, Shafts, Embankments, Stations.
- Geo-technical Works To Merstham Cutting
- Installation Works To Rail Bridge
- De-vegetation Of Lime Street Cutting, Liverpool
- Inspection To Forth Rail Bridge
- Westminster bridge in London
- Hanger Cable Clamp Bolt Changes To Humber Bridge
- QE II Bridge Dartford
Building Inspection & Maintenance - Case Studies >
- Rope Inspection & Repair
- Rope Access Tower Block Inspections
- Rope Access Inspect & Repair the Tallest Free-Standing Structure in the UK
- Rope Access Safety Work to Buildings for the Health & Safety Executive
- Abseiling skills used to clean Royal Albert Hall Organ
- Delamination NDT to Jet Engine Test Facility For Rolls-Royce
- Inspection & Investigation Works, 65 Tower blocks London Borough Council
- Investigation To Glazed Units and Fixings, Prada Museum, Madrid
- Paint and Coating Condition, Flood Light Towers, Blackpool FC
- Investigation Of Brick Slips and Brick Panels On 64 Tower Blocks
Highways Bridge Maintenance - Case Studies >
- Inspection, Testing & Maintenance of Bridges
Confined Spaces & Mast Works - Case Studies >
- Main towers to QEII, Dartford River Bridge
- Emley Moor TV Mast
- Floodlight maintenance for Blackpool FC
Should you require any further information, please do not hesitate to phone us: 0800 030 4391 or email: info@hrsservices.co.uk
